Wednesday, May 19, 2010

Busy,busy,busy

Quite a few weeks between breaks with a couple of weekend displays we have been involved in.First was at the marvelous David Hack day at Aerotech in Toowoomba.Second was the Emu Gully Air,Land and sea Spectacular.
going out of the Hangar we had the oppurtunity to clean and service the cutaway Merlin engine in the Main museum.
Parts wise the lower rear longeron brackets continue to be made,also the fabrication of F10,s parts.The cockpit door latch is slowly taking shape.
With the arrival of our stretcher/shrinker set the straightening of frames can start,then the jig aligned before the longerons added and drilled off.That will give us a huge start on the skeleton construction.More to come soon.